Skip to content

    Burbank, CA · San Fernando Valley, Central & East

    Pool construction prices in Burbank, CA: 2026 ranges

    A pool construction in Burbank costs $95–$230 per sq ft of water surface, with a typical mid-size pool running $84k–$137k. Small projects start around $58k; large or high-end work can reach $263k or more.

    As of 2026, costs in Burbank run about 5% above the LA County baseline due to tight lot sizes and studio-zone demand on local trades.

    Updated

    Cost per sq ft of water surface
    $95–$230 per sq ft of water surface

    Pool Construction Cost by Size in Burbank

    Totals adjusted for the Burbank market (1.05× LA County baseline). Ranges include labor, materials, permits, and contractor overhead.

    Pool Construction cost by size in Burbank, CA
    SizeTypeRangeLowHigh
    SmallPlunge / cocktail poolup to 250 sq ft$58k$90k
    MediumStandard gunite300–450 sq ft$84k$137k
    LargeLuxury w/ spa & water features500+ sq ft$132k$263k

    What Affects Pool Construction Cost in Burbank?

    • Construction type (gunite vs fiberglass vs vinyl).
    • Spa addition.
    • Decking.
    • Equipment (pump/heater/automation).
    • Permit.
    • Soil and grading.
    • Burbank market premium: local pricing reflects tight lot sizes and studio-zone demand on local trades, which shifts totals about 5% above the LA County baseline.

    Get exact pool construction bids in Burbank

    Two or three licensed builders who work in Burbank, pricing the same scope.

    Pool Construction Sub-Type Comparisons

    Gunite Pool vs Fiberglass Pool

    Gunite is fully custom and lasts 50+ years at $80k–$200k; fiberglass shells install in 3–5 weeks at $55k–$120k but are size-limited (≤16 ft wide) and don't fit narrow hillside lots.

    Plunge Pool / Cocktail Pool vs Pool with Spa

    A plunge pool fits LA's small lots at $55k–$85k and skips most decking; adding an integrated spa pushes the project to $90k–$170k but extends use into winter.

    How to Get the Best Price on a Pool Construction in Burbank

    1. Get line-itemized bids from two or three builders on the same scope; Burbank pool construction pricing commonly varies 10–25% between contractors.
    2. Lock major materials and finishes before signing; mid-project change orders are the #1 cost driver on pool construction jobs.
    3. Bid in shoulder seasons (Jan–Mar or Sep–Oct) when Burbank contractor schedules are open and rush premiums disappear.
    4. Verify CSLB license, insurance, and bond before paying any deposit. California caps deposits at $1,000 or 10% of contract, whichever is less.

    What is a pool construction?

    Pool construction builds a new in-ground pool: excavation, steel and gunite or a fiberglass shell, plumbing, equipment, interior finish, coping and decking. California pools need a permit and drowning-prevention safety features.

    How to get an accurate price

    1. 1.Write down the scope: size, any layout changes, the finish level, and who supplies fixtures and materials.
    2. 2.Get bids from two or three licensed builders who work in Burbank, all pricing that same pool construction scope.
    3. 3.Line the bids up item by item. Check allowances, permits, exclusions, and whether overhead and profit are shown.
    4. 4.Before any deposit, check each builder's CSLB license and insurance. As of 2026, California caps a home improvement down payment at $1,000 or 10% of the contract, whichever is less, according to the Contractors State License Board.

    Already have a bid? Grade it in two minutes or read how to compare quotes.

    Questions about Pool Construction in Burbank

    How much does a pool construction cost in Burbank, CA?

    A pool construction in Burbank costs $58k–$263k, with a typical mid-size pool running $84k–$137k. Per-unit pricing falls in the $95–$230 per sq ft of water surface range.

    Do I need a permit for a pool construction in Burbank?

    Yes for most scopes — LADBS or the local city building department requires permits any time you move plumbing, gas, electrical, or alter structure. Like-for-like cosmetic refreshes generally don't.

    How long does a pool construction take in Burbank?

    Plan for 4–14 weeks of construction in Burbank depending on size and complexity, plus 2–8 weeks for design, permits, and material lead times.

    Need more answers? Visit our contractor FAQ hub.

    Get Matched with Licensed Burbank Contractors

    Tell us about your pool construction and we'll line up two or three licensed builders who work in the area.

    Please provide your details, and we will call you at your preferred time to understand your project scope and guide you through the next steps in getting assigned to the right contractor.

    Privacy Policy·Terms and Conditions