---
title: "What is a change order? — California Contractor FAQ"
description: "A change order is a written amendment to a construction contract that documents a change in scope, price, or schedule. In California…"
url: https://keystoneconnect.us/faq/what-is-change-order
updated: 2026-06-13
---

Contracts & Deposits

# What is a change order?

A change order is a written amendment to a construction contract that documents a change in scope, price, or schedule. In California it must be signed by both parties before the changed work begins — verbal change orders are not enforceable and are a leading source of disputes.

Updated June 2026

## Related questions

### What must a California home improvement contract include?

+

Under B&P Code §7159, every home improvement contract over $500 must include the contractor's name/address/license number, a complete scope of work, total price, payment schedule, start and completion dates, a three-business-day right to cancel (five if you're 65 or older, seven for repairs after a declared disaster), and the CSLB notice and mechanics lien warning — in writing, signed before work begins.

### What is a typical contractor payment schedule in California?

+

A safe payment schedule ties draws to completed milestones — never to the calendar. A common pattern: 10% deposit (or $1k cap), 20% at rough framing/demo complete, 25% at rough mechanicals, 25% at drywall, 15% at substantial completion, 5% retention released after final punch list and lien waivers.

### What red flags should I watch for in a contractor bid?

+

Major red flags: a deposit over 10% or $1,000, no license number on the bid, vague scope ("labor and materials to remodel kitchen"), no payment schedule tied to milestones, no proof of insurance, a price well below other bids for the same scope, and pressure to sign today.

-   [Full answer: What must a California home improvement contract include?](https://keystoneconnect.us/faq/what-must-ca-home-improvement-contract-include)
-   [Full answer: What is a typical contractor payment schedule in California?](https://keystoneconnect.us/faq/contractor-payment-schedule-california)
-   [Full answer: What red flags should I watch for in a contractor bid?](https://keystoneconnect.us/faq/red-flags-contractor-bid)

## More on contracts & deposits

-   [How much should a contractor deposit be in California?](https://keystoneconnect.us/faq/contractor-deposit-california)

## Official sources

-   [Look up a contractor's license on the CSLB website](https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx)
-   [California home improvement contract requirements (Business and Professions Code §7159)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7159)

[All contractor questions](https://keystoneconnect.us/faq)

## Want builders who've already been checked?

We check license, bond and insurance before we introduce anyone. Free to homeowners.

[Tell us about your project](https://keystoneconnect.us/contact)[or call (818) 482-8365](tel:+18184828365)
